Project Name: Design Stage of Luzhou City Design Building Project Progress: Construction Preparation Construction Period: June 2011-April 2012 Main equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, lighting facilities, and cranes.
Project Introduction:
The project is located at Block C1 on the south side of Xingguo Middle Road, Zhangjiang New District, Ganzhou City, with a total construction area of ​​approximately 16,000 square meters, a basement floor, and 15 floors above ground, including the second floor of the podium.
The total investment of the project: 25 million yuan.
Project Introduction:
The project is located at Block C1 on the south side of Xingguo Middle Road, Zhangjiang New District, Ganzhou City, with a total construction area of ​​approximately 16,000 square meters, a basement floor, and 15 floors above ground, including the second floor of the podium.
The total investment of the project: 25 million yuan.
Construction Unit: Luzhou Urban-Rural Planning & Design Institute Postal address: 83 Houde Road, Zhangzhou City Zip Code: 341000
Contact: Liu Mingfei Telephone