Model NO.: RF-DW
Control System: PLC with Touch Screen
Place of Orgin: Wuxi, China
Delivery Time: 50 Days After Deposit
Package: Film and Steel
Trademark: Suhang
Transport Package: Film and Steel
Specification: CE, SGS, ISO9001: 2008
Origin: Wuxi, Jiangsu
HS Code: 8455229090
Metal Stud/Track/Furring Channel Roll Forming Machine1. Technical Process
Decoiler- Feeding with guide- Roll forming- Cutting - Products CollectingÂ
2. Technical Parameter
 | Items | Specifications |
Material of coil | Material Thickness | 0.3-0.8mm galvanized |
Sizes | Width and height | 63*38mm and 89*41mm |
De-coiler | Weight | 3 ton manual |
Punching | Number | 5 sets of punching moulds, two for the round holes, another for the dimple screws, two for the rectangular holes |
Forming system | Rolling Speed | 10-12 m/min |
 | Roller Stations | About 13 stations forming |
 | Roller Material | Gcr15 Steel with quenching |
 | Shaft Material | 45# Steel Diameter 75mm shaft  |
 | Maim Motor Power | 7.5 kw |
 | Hydraulic cutting Power | 5.5 kw |
Cutting system |
Material Of Cutting | CR12 with quench treatment |
 | Hardness | HRC58-62 |
 | Tolerance | +-1.5mm |
 | Cutting blade | 1 set of cutting blade |
Electrical control system | Electric Source | 380V, 50HZ,3 phase  |
 | Control System | PLC with touch screen Japanese Panasonic and Yaskawa Brand |
 | Weight | About 3 tons |
 | Way Of Drive | 1 inch single chain |
 | Size of machine | Length 5500mm* Width 800mm* Height 1000m |
3. Assembly and commissioning
One engineer will visit Buyer's workshop for install, commission and training, The customer should ensure the pre-installation being carried out appropriately. The buyer pays the round-trip air-tickets, local cost in buyer's workshop; buyer has to pay USD100 per day, per engineer.
4. Payment Term:T/T,L/C.
30% T/T in advance and 70% T/T after inspection before shipment.
Â
Warranty
 1. One year, and we will provide the technical support for the whole life.
 2. Training: the buyer should charge of visa, return ticket, food and accommodation,overseas and USD100/person/day for salary.
 3. Need one techniciansÂ
 4. Training time: one week (contains the time of installation and adjustment)
Bicycle Parts
Jiaxing Love Riding Electronic Technology Co.Ltd. , https://www.loveridings.com